710 Dearborn Park Lane is an industrial building in Columbus, Ohio, arranged for a business that sells, stores and moves physical product from one address. The front of the property handles people, while the large floor behind it handles material, racking and trucks.
The single story building has a textured concrete facade and sits beside a broad paved lot with striped parking in front. Service and delivery vehicles can pull close to the building, and a paved drive runs past the side to the rear service area. That arrangement keeps daily coming and going, receiving and shipping close to the doors without forcing work traffic through the customer parking area.
A defined entrance opens to a reception and counter area with wall displays for samples and product options. The layout lets a visitor check in, ask questions and review materials near the front door. A separate private office nearby offers a closed room for paperwork, phone calls and one on one conversations away from the activity of the sales floor.
Behind the office front, the building opens to a large warehouse with concrete floors and a high open ceiling with exposed structure and skylights. Wide aisles accommodate tall pallet racking for stored stock, with open floor elsewhere for staging, carts and forklift movement. Overhead doors connect the warehouse floor directly to the exterior pavement, so pallets can move between indoor storage and a waiting vehicle in a short run. A separate personnel door beside the loading area gives staff a direct way in and out of the warehouse during the workday.
The connection between the parts is the strength of the plan. Office and showroom space stays near the parking and public entrance, while bulk storage and loading sit deeper in the building with their own exterior access. That separation suits a distributor, contractor supply house or service operation that greets customers up front while receiving, stocking and shipping continue in back.
17,500 SF end cap unit available for lease ready for occupancy in March of 2024.
The building combines a front reception, counter and display area with private office space and a large warehouse behind it. It suits a distributor, supply house or service business that needs to meet customers and store and move material in the same place.
The warehouse has concrete floors, a high open ceiling with skylights, and wide aisles set for tall pallet racking and forklift movement. Overhead doors open directly to exterior pavement for moving pallets between indoor storage and vehicles.
Staff and visitors use the striped surface lot in front and enter through the front entrance into the reception area. The warehouse has its own overhead and personnel doors, so work traffic can use the side and rear pavement.