Cooper Progress Park - Shipping & Receiving

105 N Sandusky, Mount Vernon, OH 43050

About

57,000 SF Shipping & Receiving building within Cooper Progress Park. Great accessibility. 35’ Clear ceiling height. 9” Floor thickness. 800 AMP / 480 Volts. 4 Loading docks / 4 Drive-in doors. 5 Ton bridge crane. Some racking in place.

  • Great Accessibility
  • 13,000 SF of contiguous office space (optional)
  • 35’ Clear height
  • 9” Floor
  • 800 AMP / 480 Volts
  • Four (4) Loading Docks (9’ x 9’)
  • Four (4) Drive-in Doors (from 10’ x 12’ to 12’ x 15’)
  • 5 Ton bridge crane
  • Some racking in place

Suite Available

Location

TenantBase does not represent any properties displayed on this site.
Listing courtesy of Doug Shull, dshull@ohioequities.com, NAI Ohio Equities

Tour This Property

Create an account to connect with a local broker who can help you tour this property and others!